E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe

Product Details
Customization: Available
Type: Seamless
Technique: Hot Rolled
Manufacturer/Factory, Trading Company
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Plant Area
>2000 square meters
  • E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
  • E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
  • E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
  • E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
  • E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
  • E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • Workshop
  • Our Service
  • Why Choose Us
  • FAQ
Overview

Basic Info.

Model NO.
E235 E355 ASTM A36
Material
Carbon Steel
Surface Treatment
Black
Usage
Pipeline Transport, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration
Section Shape
Round
MOQ
1PC
Delivery Condition
N
Cutting Service
Available
Price Term
Fob CFR CIF
Delivery Time
15-30 Days After Deposit
Transport Package
N/M
Specification
OD10-812mm, Thickness1-200mm
Trademark
Origial
Origin
China
HS Code
7304199200
Production Capacity
50000tons/Year

Product Description

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
Product Description
Product Name Carbon Steel Pipe/Seamless Steel Plate
Size OD 10-812mm
Thickness 1-200mm
Length SRL,DRL,5.8M,11.8M
Steel Material ASTM A53/A106,API 5L,EN10216,DN162ASTM A179 A192 A210
Steel Grade Grade A,Grade B,Grade C,X42,X52.S235JRH,S355,P265 ect.
Process Hot rolled/hot expansion/cold drawn/cold rolled
Usage High temperature service
Surface Bared Black Painting, Galvanized,Coating
Proctor Plastic cap
Package Bundles, Bulk
Inspection With Hydraulic Testing, Ultrasonic testing or X-ray Test
Certificate  API
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment: L/C or T/T
 
Detailed Photos

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
Packaging & Shipping

The steel pipe will be packed in seaworthy packing such as steel strips bundles. If you have any special requests on this, please let us know advanced. We will refer to your email kindly.

1).20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High)

2).40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High)

3).40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High)

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe
Company Profile

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe

Based on "Honesty Always be rewarded. " to do steel export business. Our company already has done steel exports business for 10 years. Specializing in steel plate, steel bar, steel tubes, steel plate cutting parts, and steel deep processing service. With our competitive price and best service, we are committed to your one-stop service of steel material. Our clients are all over the world, USA, Canada, Brazil, Mexico, Venezula, Austrial, Greece, Middle East, Sourtheast Ausia, and Africa.

In 2016, Henan Steel Guang International Trade Co., Ltd is seperated from the export department of Henan Rongshenghui Trading Co.,Ltd. After long-term efforts, now we have a steel plate cutting factory, with 18 CNC cutting machines and 3 punching machines, and a heat treatment factory with 3 electric heat furnaces. Set up two offices in Wugang City and Zhengzhou City. The company has developed into an integrated trader and manufacturer with the ability to export, import, process, logistics and distribution. The advanced management brings high quality to automobile and wins good reputation from market and clients.
Workshop

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe

Our Service

Pre-sale Service
1.Good quality + Factory price + Quick response + Reliable service
2.100% responsible for the quality:all the products are produced by our professional workman and we have a high-work-effect foreigh trade team.
3.We have enough stock and can deliver in short time.
4.Customized designs,colors,sizes and logos are welcome,responsiveness to customers' requirements.

After-sale Service:
1.We will count cheapest shipping cost and make invoice to you at once.
2.On time delivery.
3.Provide real pictures of loading container,email you the tracking NO. and help to chase the products until the goods arrive you.
4.24 hours online service,if any question,please contact us at anytime in your convenience.

E235 E355 ASTM A36 Carbon Steel Pipe/Seamless Steel Pipe

Why Choose Us

1. More than 10 years Professional steel export service. Have own production line.
2. Advanced CNC machine.
3. Low cost&Quick Delivery&High quality.
4. Integrity, strength and quality of products recognized by the industry.
5. Most of our clients are international, the domestic well-known enterprises.
6. Has a complete scientific quality management system. 
7. Can meet any requirements for all kinds of sheet metal processing with advanced equipment.

FAQ

Q1: How can I get a sample to check your metal work quality?
Answer: After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under USD35), as long as you afford the express freight.

Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.

Q3: What about the leading time for metal work mass production?
Answer: Honestly, it depends on the order quantity. Normally, 15 workdays to 30 workdays after your deposit if no the samples are confirmed.

Q4: What will we do if the metal work quality is not ok?
Answer: If the quality problem is caused by our mistake, we will make replacement order for free or pay the back product charge and handling charge back to you.



More questions, please send the email to us!


  
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier