• P355gh LPG Tank Boiler Vessel Steel Plate
  • P355gh LPG Tank Boiler Vessel Steel Plate
  • P355gh LPG Tank Boiler Vessel Steel Plate
  • P355gh LPG Tank Boiler Vessel Steel Plate
  • P355gh LPG Tank Boiler Vessel Steel Plate
  • P355gh LPG Tank Boiler Vessel Steel Plate

P355gh LPG Tank Boiler Vessel Steel Plate

After-sales Service: One-Stop Service
Warranty: One Year
Type: Steel Plate
Standard: GB, DIN
Certification: ISO, SGS
Surface Treatment: Blackface
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • Workshop
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
P355gh
Technique
Hot Rolled
Application
Mold & Dies, Boiler Plate, Container Plate, Wear Resistant Plate
Special Use
Cutting Tools, Measuring Tools, Cutters in Common Steel, High-strength Steel Plate
Stock
Stock
Mtc
Original
Delivery Condition
N, Q+T
Cutting Service
Available
Mark
Origial
Price Term
Fob CFR CIF
Payment Term
T/T L/C (Deposit)
Delieve Time
15-21 Days After Deposit
Packing
Standard Seaworthy Package
Transport Package
N/M
Specification
6-150mm*1000-4000mm*1000-20000mm
Trademark
Orignal
Origin
China
HS Code
7225999000
Production Capacity
50000tons/Year

Product Description

Product Description

P355GH LPG Tank Boiler Vessel Steel Plate 

Standard: EN10028-1, EN10028-2
Flat Products Made of Steels for Pressure Purposes - alloy steels, Heat Resistant Pressure Vessel Steels
These steel grades are characterized by a good weldability. They are used above all for manufacturing boilers, pressure vessels and pipes transporting hot liquids. The user of these steel grades must make sure that his calculation, design and processing methods are appropriate for the material. The grades of this series offer good cold and hot-forming properties.
Heat Treatment: N+T, Q+T
P355gh LPG Tank Boiler Vessel Steel Plate
P355gh LPG Tank Boiler Vessel Steel Plate


 
Standard: EN10028-1, EN10028-2
Grade : P235GH, P355GH, 16Mo3, 13CrMo4-5, 10CrMo9-10
Thickness : 8mm-150mm 
Width : 1000mm-4000mm 
Length : 1000mm-20000mm
MOQ: 1 PC 
Product type : Steel plate
Delivery time : Promptly ( Stock) or 10-40 days (Production)

Payment Terms: L/C, T/T, etc
Stock : Available
MTC: Available
Delivery condition: Q+T or +N
MTC: Original
Detailed Photos

P355gh LPG Tank Boiler Vessel Steel Plate
P355gh LPG Tank Boiler Vessel Steel PlateP355gh LPG Tank Boiler Vessel Steel PlateP355gh LPG Tank Boiler Vessel Steel PlateP355gh LPG Tank Boiler Vessel Steel Plate

Packaging & Shipping

P355gh LPG Tank Boiler Vessel Steel Plate

Company Profile

P355gh LPG Tank Boiler Vessel Steel Plate
Based on "Honesty Always be rewarded. " to do steel export business. Our company already has done steel exports business for 10 years. Specializing in steel plate, steel bar, steel tubes, steel plate cutting parts, and steel deep processing service. With our competitive price and best service, we are committed to your one-stop service of steel material. Our clients are all over the world, USA, Canada, Brazil, Mexico, Venezuela, Australia, Greece, Middle East, Southeast Asia, and Africa.

In 2016, Henan Steel Guang International Trade Co., Ltd is separated from the export department of Henan Rongshenghui Trading Co.,Ltd. After long-term efforts, now we have a steel plate cutting factory, with 18 CNC cutting machines and 3 punching machines, and a heat treatment factory with 3 electric heat furnaces. Set up two offices in Wugang City and Zhengzhou City. The company has developed into an integrated trader and manufacturer with the ability to export, import, process, logistics and distribution. The advanced management brings high quality to automobile and wins good reputation from market and clients.

https://steelguang.en.made-in-china.com/product-list-1.html

Workshop

P355gh LPG Tank Boiler Vessel Steel Plate
Our factory is located in Wuyang City, Henan Province, founded in 2009, is a set of steel plate research and development,manufacturing, sales in one of the professional manufacturers. The factory covers an area of more than 50,000 square meters, the existing workers more than 300 people, including more than 200 senior technical personnel, engineers more than 20 people, with an annual production of more than 100,000 tons of processing parts. 
our factory after more than 10 years of expansion has always been adhering to the integrity, mutual benefit and win-win business philosophy, Based on the wide and thick steel plate production and scientific research base of Hegang Wugang, we are committed to becoming a first-class steel supplier and equipment supplier in China. 
With high quality products help "iron power" of the Chinese dream is our common vision, we have customers throughout Europe, north and South America, Middle East, southeast Asia, South Africa, Australia and other regions, we regard product quality as the lifeline, always adhere to the "quality first, service first" sales principle and "focus on professional, really sincere" the service idea, By the majority of customers praise and trust.

Our Advantages

P355gh LPG Tank Boiler Vessel Steel Plate


Why Choose Us?
Our advantages:
1. More than 10 years Professional steel export service. Have own production line.
2. Advanced CNC machine.
3. Low cost&Quick Delivery&High quality.
4. Integrity, strength and quality of products recognized by the industry.
5. Most of our clients are international, the domestic well-known enterprises.
6. Has a complete scientific quality management system. 
7. Can meet any requirements for all kinds of sheet metal processing with advanced equipment.
 
FAQ

 

Q1: How can I get a sample to check your metal work quality?
Answer: After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under USD35), as long as you afford the express freight.

Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.

Q3: What about the leading time for metal work mass production?
Answer: Honestly, it depends on the order quantity. Normally, 15 workdays to 30 workdays after your deposit if no the samples are confirmed.

Q4: What will we do if the metal work quality is not ok ?
Answer: If the quality problem is caused by our mistake, we will make replacement order for free or pay the back product charge and handling charge back to you.



More questions, please send us the email to us.











 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now