• Hot Rolled Seamless Steel Tube/Pipe
  • Hot Rolled Seamless Steel Tube/Pipe
  • Hot Rolled Seamless Steel Tube/Pipe
  • Hot Rolled Seamless Steel Tube/Pipe
  • Hot Rolled Seamless Steel Tube/Pipe
  • Hot Rolled Seamless Steel Tube/Pipe

Hot Rolled Seamless Steel Tube/Pipe

Type: Seamless
Technique: Hot Rolled
Material: Carbon Steel /Alloy Steel
Surface Treatment: Oiled
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Construction & Decoration
Section Shape: Round
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • Workshop
  • Our Service
  • Why Choose Us
  • FAQ
Overview

Basic Info.

Model NO.
Steel Tube
Delivery Condition
N, Q+T
Processing Service
Welding, Cutting, Punching
Price Term
Fob CFR CIF
Payment Term
L/C T/T (30% Deposit)
Service
24 Hours Online
Delivery Time
15-30 Days After Deposit
Package
Standard Seaworth Packing
Transport Package
N/M
Specification
OD10-812mm, Thickness1-200mm
Trademark
Orignal
Origin
China
HS Code
7304599000
Production Capacity
50000tons/Year

Product Description

Hot Rolled Seamless Steel Tube/Pipe
Product Description

Steel Pipe Type

Seamless steel pipe

Outside Dia(mm)

10-812mm

Wall Thickness(mm)

1-200mm

Length

Random length:5-12m

Standard

API5L , ASTM A106 Gr.B, ASTM A53 Gr.B,

ASTMA179/A192/A213/A210/370WP91,WP11,WP22 GB5310-2009,GB3087-2008,GB6479-2013,GB9948-2013,

GB/T8163-2008, GB8162-2008,GB/T17396-2009

Material

20#, A53B, A106B, API 5L

ST37.0,ST35.8,St37.2,St35.4/8,St42,St45,St52,St52.4

STP G38,STP G42,STPT42,STB42,STS42,STPT49,STS49

Surface

Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,ect

Packaging

Loose package, Packaged in bundles(3Ton Max) , bundled pipes with two slings at the both end for easy loading and discharging, End with Plastic caps or as per requirement

Application

1. Fluid pipe

2. Power Plant 

3. Structure pipe
4. High and low pressure Boiler tube

5. Seamless pipe  /tube for petroleum cracking  

6. Conduit pipe 

7. Scaffolding pipe pharmaceutical andship,building etc

Detailed Photos

Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe

Packaging & Shipping

Package:
Normal Packing:In Bundles or In Bulks or seaworthy package Special Packing:according to customers' requirements.
Pipe End:Plain\Beveled\Thread with Coupling or cap.

Shipment:
a.length:≤5.8m loaded in 20FT Container with 25-27tons
b.length:≤11.8m loaded in 40FT Container with 25-27tons
Trade Terms: FOB / CIF / CFR
Payment Terms: L\C T\T
Loading Port: Tianjin or Shanghai port ,China
Delivery: within 15 days after received the 30% deposit of T/T.
We can produce special specification of the galvanized steel pipe products according to your requiremen

Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe

Company Profile

Hot Rolled Seamless Steel Tube/Pipe

Based on "Honesty Always be rewarded. " to do steel export business. Our company already has done steel exports business for 10 years. Specializing in steel plate, steel bar, steel tubes, steel plate cutting parts, and steel deep processing service. With our competitive price and best service, we are committed to your one-stop service of steel material. Our clients are all over the world, USA, Canada, Brazil, Mexico, Venezuela, Australia, Greece, Middle East, Southeast Asia, and Africa.

In 2016, Henan Steel Guang International Trade Co., Ltd is separated from the export department of Henan Rongshenghui Trading Co.,Ltd. After long-term efforts, now we have a steel plate cutting factory, with 18 CNC cutting machines and 3 punching machines, and a heat treatment factory with 3 electric heat furnaces. Set up two offices in Wugang City and Zhengzhou City. The company has developed into an integrated trader and manufacturer with the ability to export, import, process, logistics and distribution. The advanced management brings high quality to automobile and wins good reputation from market and clients.
Workshop

Hot Rolled Seamless Steel Tube/Pipe
Hot Rolled Seamless Steel Tube/Pipe

Our Service

Pre-sale Service:
1.Good quality + Factory price + Quick response + Reliable service
2.100% responsible for the quality:all the products are produced by our professional workman and we have a high-work-effect foreigh trade team.
3.We have enough stock and can deliver in short time.
4.Customized designs,colors,sizes and logos are welcome,responsiveness to customers' requirements.

After-sale Service:
1.We will count cheapest shipping cost and make invoice to you at once.
2.On time delivery.
3.Provide real pictures of loading container,email you the tracking NO. and help to chase the products until the goods arrive you.
4.24 hours online service,if any question,please contact us at anytime in your convenience.

Hot Rolled Seamless Steel Tube/Pipe
Why Choose Us

1. More than 10 years Professional steel export service. Have own production line.
2. Advanced CNC machine.
3. Low cost&Quick Delivery&High quality.
4. Integrity, strength and quality of products recognized by the industry.
5. Most of our clients are international, the domestic well-known enterprises.
6. Has a complete scientific quality management system. 
7. Can meet any requirements for all kinds of sheet metal processing with advanced equipment.

FAQ

Q1: How can I get a sample to check your metal work quality?
Answer: After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under USD35), as long as you afford the express freight.

Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.

Q3: What about the leading time for metal work mass production?
Answer: Honestly, it depends on the order quantity. Normally, 15 workdays to 30 workdays after your deposit if no the samples are confirmed.

Q4: What will we do if the metal work quality is not ok ?
Answer: If the quality problem is caused by our mistake, we will make replacement order for free or pay the back product charge and handling charge back to you.




More questions, please send the email to us!



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now